Projects

They key is to get moving
alt text
Past Producer
Fuchsia-Massif
The only permitted underground asset in the Cobalt camp. Past production totalled 9.5 million oz silver, and 300,000 lbs cobalt.
View Project
alt text

Temiskaming Testing Labs

Fully certified processing facility located in the town of Cobalt

The acquisition achieves a key goal of becoming a vertically integrated leader in Canada’s silver-cobalt heartland with multiple potential revenue streams: bullion pouring, bulk sampling, commercial assaying and e-waste processing.
Located within just 50 meters of a rail line and just a short distance from Canada Cobalt’s Castle and Beaver properties, the facility will also become the new home of the Company’s environmentally friendly Re-2OX Process.
Button
alt text

Re-2Ox Process

A purely hydrometallurgical approach for selective metals recovery

The process takes metal-rich mining concentrates or recycled battery materials and converts them into premium value-added battery materials. Lab tests exceed technical specifications of cathode producers in Asia.
SGS Canada (Lakefield) is designing and building the pilot plant. Current testing is focused on recovery and metal recycling from Lithium-ion, Nickel-hydride and Nickel cadmium batteries to capture valuable materials and divert spent batteries from landfills.
© 2024, All Rights Reserved.
Designed By Resource Active
Links
Home
About
Projects
Investors